Product Details:
|
Product Type: | Professional Digital Pipe Fusion Machine 110mm | Item No.: | SENPU-110 |
---|---|---|---|
Heating Element: | Digital Adjustment Temperature Controller | ||
High Light: | 75mm plastic fusion welding equipment,110mm socket fusion welder,Digital Socket Fusion Welding Equipment |
Product Description |
Digital 20-110mm Manual Ppr Pvc Welding Machine Portable welding tool,Digital pipe fusion machine is digital model. Compared with normal socket fusion machine, the digital pipe welding machine has a window on handle to show the working temperature and buttons to set the temperature. The working temperature can be set between 200 to 280. So the digital pipe fusion machine can be used to weld PP-R, HDPE, PB and other material welding temperature between 200 to 280.
Product Type: Professional Digital Pipe Fusion Machine 110mm
Item No.: SENPU-110
Heating Element: Digital adjustment temperature controller
Brand Name: SENPU or OEM
Color: Green and customized
Guarantee: 2 years guarantee and Spare parts factory cost
MOQ: As agreement and customer order
TECHNICAL SPECIFICATIONS |
|
SENPU-110 |
|
Rated Voltage |
220V |
Rated Frequency |
50/60HZ |
Rated Power |
1200W |
Working temp. |
260 degree |
Temp. Tolerance |
≤5 degree |
Warning Temp. |
295 degree |
Welding Size |
75-110mm |
Suit Material: |
PP-R/PE/PB |
N.W/G.W |
2kg/22kg |
Dimension(mm): |
470*270*270 |
Specification |
Diameter (Mm) |
Welding Depth (Mm) |
Heating Time (S) |
Processing Time (S) |
Cooling Time (Min) |
75 |
26 |
30 |
10 |
8 |
90 |
32 |
40 |
10 |
8 |
110 |
38.5 |
50 |
15 |
10 |
Product Features:
· This product is popular Pipe welding machine,all the major part are made of high quality materials,simples operation,convenient and practial ,it ut ideal for pipeline construction equipment. · The standard voltage is 110V, so if the voltage in your country is differnt, you may use a Voltage Adaptor for running the machine. Otherwise, it may cause damage to the machine. · Function: For welding plastic pipes as PP/PP-R/PE/PP-C pipe and etc.
Attention: Heating time is too short, easy to occur uneven heating of pipe parts, resulting in difficulties in counterpart; Heating time is too long, pipe parts easy to melt, there are too many colloidal substances and loss. There should be no rotation when butting The key points of connection operation of pipe fittings hot house: immediately after heating time, remove the pipe and fittings from the heating sleeve and the heating head at the same time, insert them into the standard depth without rotation, and form uniform flange at the turning joint
Welding Introduction For Digital Socket Fusion Machine: |
||||
1. Select the proper machine and pipe cutting tools. |
||||
2. Cut PP-R pipe with pipe cutting tools. |
||||
3. Clean the surface of the pipe. |
||||
4. Measure the welding depth and make it on pipe with a pen. |
||||
5. Push pipe and fitting into the welding socket and weld in it for proper time. |
||||
6. Connect pipe and fitting together and put it until the temperature be cold. |
Fusing Standards |
External diameter of pipes (mm) |
Fusing depth (mm) |
Heating time |
Processing time (s) |
Cooling time |
|
A |
B |
||||
16 |
13 |
13 |
5 |
4 |
3 |
20 |
14 |
14 |
5 |
4 |
3 |
25 |
15 |
16 |
7 |
4 |
3 |
32 |
16.5 |
18 |
8 |
4 |
4 |
40 |
18.0 |
20 |
12 |
6 |
4 |
50 |
20.0 |
23 |
18 |
6 |
5 |
63 |
24.0 |
27 |
24 |
6 |
6 |
75 |
26.0 |
28 |
30 |
8 |
8 |
90 |
29.0 |
31 |
40 |
8 |
8 |
110 |
32.5 |
36.5 |
50 |
10 |
8 |
125 |
36 |
38 |
75 |
12 |
10 |
140 |
39 |
40 |
90 |
15 |
15 |
160 |
45 |
48 |
120 |
15 |
20 |
Technical Data |
FAQ |
How to place your order:
1. Send us your order list (models/quantities/colors)
2. we will send you PROFORMA INVOICE (PI) with shipping cost and Payment information for your confirmation.
3. You arrange payment after you confirmed proforma invoice, we will arrange production after received your payment notice.
Specific delivery date depends on your specific needs, normally delivery in 1-3 days.
4.We will arrange delivery after your payment arrived and goods ready,and at the same time we will tell you goods tracking number so that you could know your goods condition by this number from courier site.
5.You will receive your order in about 3-5 days after goods ship out.
Our Company |
Projects |
Shipment |
Contact Person: Helen
Tel: 13909020919
Fax: 86-0838-2808183