Send Message
Home ProductsHDPE Corrugated Pipe

ISO HDPE Corrugated Sewage Pipes Double Wall For Construction

Certification
China Sichuan Senpu Pipe Co., Ltd. certification
China Sichuan Senpu Pipe Co., Ltd. certification
I'm Online Chat Now

ISO HDPE Corrugated Sewage Pipes Double Wall For Construction

ISO HDPE Corrugated Sewage Pipes Double Wall For Construction
ISO HDPE Corrugated Sewage Pipes Double Wall For Construction ISO HDPE Corrugated Sewage Pipes Double Wall For Construction ISO HDPE Corrugated Sewage Pipes Double Wall For Construction ISO HDPE Corrugated Sewage Pipes Double Wall For Construction ISO HDPE Corrugated Sewage Pipes Double Wall For Construction

Large Image :  ISO HDPE Corrugated Sewage Pipes Double Wall For Construction

Product Details:
Place of Origin: Tianjin, Deyang
Brand Name: SENPU
Certification: WRAS, ISO, CE, IAPMO R&T
Model Number: DN16MM-DN1500MM
Payment & Shipping Terms:
Minimum Order Quantity: 100PCS
Price: 2.75USD/METER
Packaging Details: carton box
Delivery Time: 5-10 working days
Payment Terms: TT, L/C

ISO HDPE Corrugated Sewage Pipes Double Wall For Construction

Description
Item: Sewage Double Wall Corrugated Pipes Model: DN 200-DN1800MM
Brand: SENPU Working Pressure: SN6~SN 8
Standard: ISO Certificate: CE, WRAS, IAPMO R&T.
High Light:

ISO corrugated sewage pipes

,

Double Wall hdpe sewage pipe

,

hdpe pipe for sewage

Sewage Double Wall Corrugated Pipes

Product Basic Information

   

Quality Assurance

Test whether the quality of the double wall bellows meets the national requirements, the most important method is to use the ring stiffness and ring flexibility test.The plastic pipe ring flexibility testing machine is used to test whether the pipe conforms to GB/T 9647 (ring stiffness determination standard) thermoplastic pipe ring stiffness and ring flexibility meet the national requirements.The experiment is mainly used for buried drainage of polyethylene double-wall bellows, buried drainage of hard polyvinyl chloride PVC-U structure wall pipe system,Polyethylene winding structure wall pipe, communication plastic pipe (solid wall pipe, silicon core pipe, plum-flower pipe, double wall corrugated pipe, prestressed concrete bridge plastic corrugated pipe, insulation pipe, carbon pipe, buried gas polyethylene pipe, polyethylene and PVC pipe used in underground coal mine ring flexibility, ring stiffness determination.

 

Construction Plan

1. Be familiar with the design drawings and , and make clear the pipeline layout, direction, process flow and construction and installation requirements of the supervisor and branch pipes.

2. Be familiar with the site situation and the distribution of existing plane and elevation control points along the designed pipeline.

3. Collect the measured data and draw the measured sketch according to the pipeline plane and the existing control points, combined with the actual terrain.

4. After the entry of the transition of construction units leveling points and traverse points for retest, after closure comply with the design requirements, traverse points, leveling points of encryption, each 60 meters a worldwide level points, encryption point must be closed adjustment, leveling point L closure of 20), ensure the accuracy of the encryption points, in order to meet the drain height, the precision of the linear control.

5. Because the Central Line pile of the pipeline will be removed during construction, the construction control pile should be set up in a place free from construction interference, convenient for testing and easy to protect. The Central Line direction control pile should be tested by the extension line or wire method, the position control pile of auxiliary structures should be tested by the intersection method or parallel line method.

6. The measurement in the construction process is mainly to determine the elevation of the bottom of the trough. After mechanical excavation, the following machine is used to measure and measure as the excavation is carried out to eliminate the overdigging phenomenon and ensure that the elevation of the bottom of the trough meets the design requirements.Every day before the start of the survey work, the adjacent level should be checked measurement.

7. The center of the pipeline is determined by the control pile of the center line. The edge line is drawn on the foundation of the pipeline by the control pile to determine the laying position of the pipeline.

8. The well chamber elevation shall be controlled according to the design requirements. After the pipe laying is completed, the pipe roof and structures shall be re-checked and measured upon completion.

20210628102611755586fd65214d83841417dbfa33d878

20210628102611ede24654a4db4ded8ca4bb5042158930

2021062810261171e057811f9044b6b3497f0401586ef3

2021062810261323f0259a85f4402cae9127daa4260552

20210628102614b9cd4da80b2c455db222a8d0f5353d7b

20210628102614bd4499665e0b4ddbb3df048deeb81763

20210628102617317fb3ae8622496285ad9882d667e100

20210628102619daa64c275855446cb5f2b69ef36915ab

Contact Details
Sichuan Senpu Pipe Co., Ltd.

Contact Person: Helen

Tel: 13909020919

Fax: 86-0838-2808183

Send your inquiry directly to us (0 / 3000)